go-v.orgdoi

Simulation-Based Modular Scheduling System of Semiconductor Manufacturing

Li Li, Qiao Fei Ma Yumin, Kai Ye · InTech eBooks · 2012

  • DOI 10.5772/26257
  • Publisher OpenAlex
  • Type book-chapter
  • Issued 2012

Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.

InTech eBooks · OpenAlex · book-chapter · 2012

Abstract

Weigert et al. (2009) developed a simulation-based scheduling system for a semiconductor Backend facility.The heuristic search strategies were adopted to optimize the operating www.intechopen.comProduction Scheduling 142 sequences with consideration on concurrent minimization of mean cycle time, maximization of throughput and due date compliance.Horn et al. (2006) developed a simulation-based interactive scheduling system, called "BackendPlanner", for the backend facility of a semiconductor manufacturer under practical conditions.Its special characteristics included the automated model generation from existent production databases, a heuristic optimization component, a fast-simulator, and the efficient data coupling strategy allowed the re-scheduling anytime, e.g., after machine breakdowns or other unpredictable events and several additional analysis tools reported important parameters of the manufacturing process, such as machine utilization, throughput time or work in process.Zhang et al. (2006Zhang et al. ( , 2009) ) implemented a simulation platform based on extended objectoriented petri net for real-time scheduling of semiconductor wafer fabrication systems, and designed a dynamic bottleneck dispatching algorithm to detect bottlenecks in a timely way to make adaptive dispatching decisions according to the real-time conditions.In view of semiconductor probe system's production scheduling problem, Zhang and Wang (2008) set up a probe behaviour model in terms of the figuration of UML and transformed it directly into simulation model by using the SimTalk of eM-plant.The experimental result of simulation model supplied the decision maker with evidence.Werner et al. ( 2006) developed a scheduling system for the backend of Infineon Technologies Dresden based on a discrete event simulation system and tested it in the real industrial environment.The simulation model was automatically generated from the databases of the manufacturer and was used for short term scheduling -from one shift up to one week.

How to referenceIn order to correctly reference this scholarly work, feel free to

Open the resolved locator · 10.5772/26257

Metadata licence: OpenAlex metadata (CC0)

Registry
OpenAlex DOI index + API
Fetched
2026-11-19 23:56 UTC
Cache state
not cached yet (bulk-index+openalex)
Locator
https://www.intechopen.com/chapters/25893
Metadata licence
OpenAlex metadata (CC0)
Scope
Metadata as returned by the resolver; abstracts are never generated here.