CONVIS: A tool enabling uninterrupted operation during refurbishments of complex buildings
Ugo Maria Coraglia, Gabriel Wurzer · container not stated · 2017
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
· OpenAlex · conference-paper · 2017
Abstract
Clash Detection refers to the identification of geometrical overlaps within a Building Information Model (BIM).This paper seeks to extend the notion of overlapping to activities: Given a construction site within a building, we seek to find clashes between construction activities and occupant routines.Such a situation is often encountered in the context of refurbishments of complex buildings operating 24/7 (e.g.airports, train stations, hospitals, prisons).By finding the influence radii of adverse effects resulting from construction -i.e.dust, noise and vibrations, functions may be temporarily relocated in order to guarantee uninterrupted operation.Our tool CONVIS implements these simulation and scheduling aspects and seeks to provide a digital project plan for refurbishments in the said context.
Open the resolved locator · 10.5151/sigradi2017-059
Metadata licence: OpenAlex metadata (CC0)