go-v.orgdoi

Sizing of a battery energy storage system to minimize underfrequency load shedding in island power systems

Lukas Sigrist, Luis Rouco, Jiménez, Clara · Comillas Repository (Comillas Pontifical University) · 2019

  • DOI 10.34890/989
  • Publisher Universidad Pontificia Comillas
  • Type conference-paper
  • Issued 2019

Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.

Comillas Repository (Comillas Pontifical University) · Universidad Pontificia Comillas · conference-paper · 2019

Abstract

This paper presents a method to size battery energy storage systems (BESSs) to minimize underfrequency load shedding in island power systems. The proposed method depends on a simplified representation of the power system, where generating units are represented by first-order systems. An analytical expression is derived to estimate the BESS size. The proposed method has been applied to two Spanish isolated power systems. Dynamic simulations with PSS/E software package confirm the proposed method to size BESS. BESS with a capacity around 6% to 9% of the installed generation capacity are needed to avoid load shedding.

Open the resolved locator · 10.34890/989

Metadata licence: OpenAlex metadata (CC0)

Registry
OpenAlex DOI index + API
Fetched
2026-11-20 03:38 UTC
Cache state
not cached yet (bulk-index+openalex)
Locator
http://hdl.handle.net/11531/117473
Metadata licence
OpenAlex metadata (CC0)
Scope
Metadata as returned by the resolver; abstracts are never generated here.