Introduction:Glenstone is a contemporary art museum with nearly 300 acres of landscape that was designed over two phases during the course of fifteen years.Building on PWP's work with the Glenstone Foundation over this period, the firm is actively engaged in an ongoing master plan process that continues the Foundation's mission of seamlessly integrating art, architecture, and nature.Focused on expanding experiential, programmatic, and ecological goals, the master plan seeks to provide a framework for Glenstone's continued evolution in the years to come.For the purpose of this case study investigation, the research team focused on Phase 1 and Phase 2.

Prior to Phase 1 construction, the majority of the landscape was graded as a subdivision.

Research Strategy:This case study investigation seeks to quantify several of the main goals for the project: to create a contemplative and integrated experience of nature, art, and architecture; to revitalize the formerly fragmented subdivision plots into a more ecologically sound landscape; and to engage a sustainable, systems approach to landscape maintenance, water management, reforestation, and meadow regeneration.The evaluation of Glenstone's landscape performance uses two main analysis techniques: comparative analysis, which compares primary and secondary data collected on-site, from project designers, and from contractors to industry or local averages or traditional design strategies; and cross-sectional survey, which collects data from a specific population of interest (in this case, museum visitors) at a single point in time.

Data Collection Methods:The research team relied on design drawings and pre-construction analysis provided by PWP and sub-contractors, on-site observations conducted by the research team on site visits from April-July 2019, and interviews with Glenstone staff.In keeping with the format of the Case Study Investigation program, benefits are organized into three categories: Environmental, Social, and Economic.

Environmental Benefits• Restored or improved soils on 120 acres.In one representative sample, soil testing showed a 300% increase in organic matter between 2010 and 2016.Methods: During construction, 40,000 cubic yards of topsoil was stripped and stockpiled in a single contiguous area that was overseeded with cover crops to enhance the soil's fertility.1 Soil collection and protection measures put in place during construction included harvesting stockpiled soil only when needed to limit disturbance, and using tracked rather than wheeled vehicles to transport soil to limit compaction.In total, 120 acres of restored or improved soil was constructed during the course of this project, as determined by area takeoffs by PWP.Glenstone and PWP worked with the University of Maryland and soil consultants throughout the process to map the site and determine existing soil properties.Before Phase 1 construction, when the first 0-12" of soil were tested, the soils in these test sites were found to have low to medium nutrient levels, very low levels of phosphorous with normal micronutrient levels, and low cation exchange capacity.The pH of the tested soils ranged from 5.4 to 7.5, which is acceptable for non-ericaceous plantings.The soil structure was found to be well-drained before construction, and measures were put in place to ensure that the well-drained soil onsite would be collected, stockpiled, and protected during construction.Soil health was tested before and during construction, and Glenstone employs a full-time soil technician who continuously monitors and tests soils.Soils onsite are amended using compost tea and compost produced onsite.Synthetic chemical fertilizers are not used to amend soil.Soil samples were collected and analyzed by consultants and by Glenstone's soil technician to determine and monitor soil health properties.This soil testing data was provided by PWP and Glenstone.Laboratory testing of topsoil samples (0-12") indicated that samples taken from test pits throughout the site were relatively consistent and likely represent similar soil types, with a USDA classification of sandy loam to clay loam.

2 Soil test results from before Phase 1 construction and during Phase 2 construction can be found below.Soils were also tested prior to Phase 2 construction.