go-v.orgdoi

Construction Productivity Comparison Between Cast-in-Place Concrete and Mass-Timber Framing: A Case Study of the Nation’s Largest Mass-Timber Building

Anthony Mirando, Lameck Onsarigo · EPiC series in built environment · 2022

  • DOI 10.29007/qttp
  • Publisher EasyChair
  • Type conference-paper
  • Issued 2022

Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.

EPiC series in built environment · EasyChair · conference-paper · 2022

Abstract

One main barrier to the proliferation of sustainable mass-timber structures across the United States, is construction and development teams' unfamiliarity with scheduling and efficiently managing the construction of mass-timber structural system. A comprehensive understanding of the schedule associated with the construction of mass-timber versus typical concrete structures provides important data metrics for teams deciding on utilizing this material and method. This study compares simulated manpower loaded schedules of traditional concrete construction applications with that of a real-time, mass-timber construction project.

The study produces practical outputs that highlight schedule efficiencies in mass-timber applications, when compared to cast-in-place concrete method. The study found that the mass-timber crew erected 2,323 square feet of structure per day, while a concrete crew would erect 1,825 square feet per day. Additionally, the study found that the concrete crew had more than twice as many workers as the mass timber crew with less production.

Open the resolved locator · 10.29007/qttp

Metadata licence: OpenAlex metadata (CC0)

Registry
OpenAlex DOI index + API
Fetched
2026-11-20 00:35 UTC
Cache state
not cached yet (bulk-index+openalex)
Locator
https://easychair.org/publications/paper/LWX1
Metadata licence
OpenAlex metadata (CC0)
Scope
Metadata as returned by the resolver; abstracts are never generated here.