105-KE Isolation Barrier Leak Rate Acceptance Test Report
Westinghouse Hanford Co., Richland, WA (United States), K McCracken, USDOE, Washington, DC (United States) (US) · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 1995
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 1995
Abstract
This Acceptance Test Report (ATR) contains the completed and signed Acceptance Procedure (ATP) for the 105-KE Isolations Barrier Leak Rate Test. The Test Engineer`s log, the completed sections of the ATP in the Appendix for Repeat Testing (Appendix K), the approved WHC J-7s (Appendix H), the data logger files (Appendices T and U), and the post test calibration checks (Appendix V) are included.
Open the resolved locator · 10.2172/89985
Metadata licence: OpenAlex metadata (CC0)