MARS14 simulation of Fermilab 120-GeV beam dumps
Nikolai V. Mokhov · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2003
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 2003
Abstract
To estimate groundwater activation around the Fermilab Switchyard, Meson Target Train and M03 Meson beam dumps at 120 GeV, express MARS14 [1] simulations have been performed. A proton beam RMS spot size is {sigma}{sub x}={sigma}{sub y}=1 cm in the first two cases, while {sigma}{sub x}={sigma}{sub y}=2 cm for M03. Calculated are star density distributions (above 50 MeV) normalized per one incident proton. The configurations proposed by Chuck Brown have been implemented into the MARS code.
Open the resolved locator · 10.2172/809659
Metadata licence: OpenAlex metadata (CC0)