go-v.orgdoi

DEVELOPMENT OF ODS HEAT EXCHANGER TUBING

Ph.D. Mark A. Harper · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2001

  • DOI 10.2172/809165
  • Publisher Office of Scientific and Technical Information
  • Type report
  • Issued 2001

Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.

OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 2001

Abstract

Work has begun under three major tasks of this project. With respect to increasing the circumferential strength of a MA956 tube, approximately 60 MA956 rods have been extruded using a 20:1 extrusion ratio and extrusion temperatures of 1000, 1075, 1150, and 1200 C. Also, creep testing is underway for the purpose of determining the ''stress threshold'' curves for this alloy. Regarding joining of the alloy MA956, work has begun on the friction welding, magnetic impulse welding, explosive welding, and transient liquid phase bonding aspects of this project.

And finally, material is being prepared for the laboratory fire-side high temperature corrosion tests, with potential gas and deposits for a typical Vision 21 plant being reviewed for final determination of these variables in the test program.

Open the resolved locator · 10.2172/809165

Metadata licence: OpenAlex metadata (CC0)

Registry
OpenAlex DOI index + API
Fetched
2026-11-20 03:26 UTC
Cache state
not cached yet (bulk-index+openalex)
Locator
https://www.osti.gov/errors/error429.html
Metadata licence
OpenAlex metadata (CC0)
Scope
Metadata as returned by the resolver; abstracts are never generated here.