Loss of vital ac power and the residual heat removal system during mid-loop operations at Vogtle Unit 1 on March 20, 1990
— · container not stated · 1990
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
· OpenAlex · work · 1990
Crossref supplies no abstract for this record; none is generated here.
Open the resolved locator · 10.2172/6888694
Metadata licence: OpenAlex metadata (CC0)