go-v.orgdoi

Industrial application of fluidized-bed combustion. Phase I. Quarterly technical progress report, October--December 1978

Not Available · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 1979

  • DOI 10.2172/6172000
  • Publisher Office of Scientific and Technical Information
  • Type report
  • Issued 1979

Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.

OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 1979

Abstract

Sub-Scale Unit (SSU) testing continued and several changes were made to the fuel and air supply and heat transfer systems. Demonstration plant design was highlighted by numerous specification issuances and vendor selections, especially in the fuel and air system. Planning for the test program included establishment of sampling locations. The SSU ran nearly 300 hours in test operation. Modifications to the fuel and air supply systems resulted in combustion efficiency of 85% with no reinjection. The SSU coal (Old Ben) was also tested at the Pope, Evans and Robbins facility, and performance was not as good as with their normal coal.

A different Illinois coal (Freeman United, Crown II mine) has now been procured for the SSU. We are anticipating receipt of final EPA approval of the PSD permit, and DOE approval of the Environmental Impact Assessment for the Demonstration Plant. In the area of design, over 20 new and revised specifications were issued, vendors were selected for about 10 items, and purchase orders were requested for the bed ash cooling system and for sump pumps. Explosion vents will be supplied for the coal storage silos, even though not required by code. Complete shop assembly of the coal and limestone silos was found to be impractical and, therefore, they will be sent in large sections for field assembly.

Work was initiated in several new areas. Writing of the startup procedure was begun. Engineering of the supervisory control system and the modulating controls got underway. Design of the ignition system was started. Work continued on the cost comparison between fluidized bed and pulverized coal fired plant. Test program planning included location and accessibility determination for special test instrumentation and equipment.

Open the resolved locator · 10.2172/6172000

Metadata licence: OpenAlex metadata (CC0)

Registry
OpenAlex DOI index + API
Fetched
2026-11-20 00:25 UTC
Cache state
not cached yet (bulk-index+openalex)
Locator
https://www.osti.gov/servlets/purl/6172000
Metadata licence
OpenAlex metadata (CC0)
Scope
Metadata as returned by the resolver; abstracts are never generated here.