Engineer, design, construct, test and evaluate a Pressurized Fluidized Bed Pilot Plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering. Quarterly report, June 1-August 31, 1978
Not Given Author · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 1978
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 1978
Abstract
Technical progress during the period June 1 through August 31, 1978 on DOE Contract No. EX-76-C-01-1726 is described. Operational testing of the SGT/PFB Technology Unit is discussed. Problems encountered, their probable causes and corrective action recommended are presented. Heat and material balance data from this period of testing are given and initial metallurgical findings from analyses of samples removed at completion of Phase I are summarized. Materials evaluation hardware to be incorporated for the extended program is commented on.
Final design of additional components for the Pilot Plant including start-up and auxiliary combustors, J-65 gas generator modifications, power turbine bleed valve actuation system and controls and instrumentation is reported. Status of pilot plant bid package preparation is also noted.