LMFBR alternate shutdown system development and testing. First quarterly report, October 1971--March 1972
General Electric Co., Sunnyvale, Calif. (USA). Breeder Reactor Dept., US Atomic Energy Commission (AEC) · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 1972
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 1972
Abstract
Thc system design criteria (draft) submitted to RDT for approvai are included in this report.Nine design concepts are presented that will be evaluated along with'additional concepts to select the recommended and fall-back concepts.Scoping analysis results show the fuel temperature rise as a function of various scram rates, safety system delay times, and accidental reactivity additions.
Open the resolved locator · 10.2172/4457635
Metadata licence: OpenAlex metadata (CC0)