Engineering task plan for BX/BY compressor upgrade
Westinghouse Hanford Co., Richland, WA (United States), R Strand, USDOE, Washington, DC (United States) (US) · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 1995
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 1995
Abstract
This Engineering Task Plan outlines the remaining work to be completed for the BX/BY Instrument Air upgrade. Initial work efforts were guided by Engineering Work Plan, ``BX-BY Compressor Upgrade`` dated 1-25-93 (see Attachment A) which is provided for information. The overall engineering task is to provide a permanent replacement for the instrument air supply system for the 241-BX/BY Tank Farms. The existing system consists of a 25 horsepower Worthington non-lube compressor and an Oriad air dryer. The existing equipment is dated, requires high maintenance and is located in a contaminated zone making it unusable.
The BX/BY instrument air replacement unit will be one of the 100 SCFM generic air stations. This station will be permanently sited with the addition of drawing changes to provide a concrete foundation, air piping to existing lines and electrical power supply tie-ins.