APT cost scaling: Preliminary indications from a Parametric Costing Model (PCM)
NM (United States) Los Alamos National Lab., R Krakowski, USDOE, Washington, DC (United States) (US) · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 1995
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 1995
Abstract
A Parametric Costing Model has been created and evaluate as a first step in quantitatively understanding important design options for the Accelerator Production of Tritium (APT) concept. This model couples key economic and technical elements of APT in a two-parameter search of beam energy and beam power that minimizes costs within a range of operating constraints. The costing and engineering depth of the Parametric Costing Model is minimal at the present {open_quotes}entry level{close_quotes}, and is intended only to demonstrate a potential for a more-detailed, cost-based integrating design tool.
After describing the present basis of the Parametric Costing Model and giving an example of a single parametric scaling run derived therefrom, the impacts of choices related to resistive versus superconducting accelerator structures and cost of electricity versus plant availability ({open_quotes}load curve{close_quotes}) are reported. Areas of further development and application are suggested.