Ecological evaluation of proposed dredged material from the Point Frazer Bend Reach, Winyah Bay, South Carolina
Pacific Northwest Lab., Richland, WA (United States), Jr W Gardiner, USDOE, Washington, DC (United States) (US), J Ward, J Word · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 1995
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Office of Scientific and Technical Information · report · 1995
Abstract
The port of Georgetown, South Carolina, is served by navigational channels within Winyah Bay and the lower Sampit River. Dredging is required to maintain these waterways and to facilitate normal shipping traffic. Prior to dredging, ecological evaluations must be conducted to determine the suitability of the proposed dredged material for open-ocean disposal. These evaluations are to be performed under Section 103 of the Marine Protection, Research, and, Sanctuaries Act of 1972 (MPRSA), following the testing protocols presented in Evaluation of Dredged Material Proposed for Ocean Disposal Testing Manual, hereafter referred to as the 1991 Implementation Manual.
The Charleston Intensive Project is a reevaluation of sediments collected from two stations (IH-2 and IH-3) in the Frazier Point Bend reach of the Winyah Bay channel. Reference sediment was also collected from site IH-R2, just south of Hare Island. The results of physical/chemical analyses indicated that some contaminants of concern were present in test treatments representing dredged material when compared with the reference treatment IH-R2. The results of this study indicate that, based on the acute toxicity and chemical analyses, dredged material represented by these test treatments is suitable for open-ocean disposal.
Open the resolved locator · 10.2172/28397
Metadata licence: OpenAlex metadata (CC0)