Alba Northern Platform-Produced Water System Improvements
Turnbull David · SPE International Symposium on Oilfield Chemistry · 1999
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
SPE International Symposium on Oilfield Chemistry · OpenAlex · conference-paper · 1999
Abstract
Abstract The Alba Field is operated by Chevron UK Ltd and located in the central North Sea. It came on stream in January 1994. As water production levels increased, it became progressively more difficult to maintain the oil in water overboard figure below the statutory requirement of 40 ppm. Process investigations included a full system fluids characterisation study which identified a mean oil droplet size of 8–10 micron in the produced water. The original platform design assumed a larger oil in water droplet size and this low value produced a correspondingly low removal efficiency from the existing produced water hydrocyclone facility.
Initial side stream trials led to the development and installation of a 20 tonne ‘interim’ produced water polishing vessel to enhance the existing facilities for oil in water separation. A Computational Fluid Dynamics programme was utilised to model fluid flow in the new vessel and support the planned design of a full size vessel with the capability of treating 390,000 BWPD (3 times the present produced water rate) to fully meet the platforms predicted needs. A programme of specific chemical product screening singled out a newly developed dithiocarbamate chemistry as being highly effective in meeting the demands of limited chemical contact time and the short vessel residence time available.
This combined chemistry and engineering design approach resulted in the platform meeting the 40 ppm oil in water discharge specification and thus avoiding the serious threat that continued non conformance posed to the current high oil production rates. This paper describes the essential stages of this work and discusses the results and remedial action taken from the initial investigation through to the successful resolution of this problem. The paper content presents this from both an engineering and chemical treatment perspective.
Open the resolved locator · 10.2118/50737-ms
Metadata licence: OpenAlex metadata (CC0)