BERGA-ELSTER (“SCHWALBE V”)
Christine Schmidt van der Zanden · container not stated · 2009
Not cached yet. This record was fetched live for this request and is stored after the lookup. Reopening the page should serve the cached copy.
· OpenAlex · reference-entry · 2009
Abstract
In the wake of increasing Allied bombing attacks, Germany’s fuel reserves sank to a dangerously low level. In August 1944, as part of the Geilenberg Program, the Armaments Ministry established the Petroleum Securing Plan, whose implementation belonged to the Kammler Staff. As part of this plan, under code name “Schwalbe V” (Swallow V), the Kammler Staff supervised the construction of an underground hydrogenation plant for Braunkohle-Benzin AG (Brown Coal-Gasoline AG, Brabag) in Zeitz in Berga an der Elster and appointed as project manager SS-Obersturmführer Willy Hack.
Hack was transferred to Berga on November 6, 1944, where his site manager and geologists tested the mountain rock for internal water channels. After Sonderinspektion I (Special Inspectorate I) reviewed drilling samples in Berlin, Brabag made concrete plans for the mining operation. Braun und Co. Schieferverwaltung, a cover name for Brabag-Zeitz, functioned as the owner and Reich trustee. The company employed mining co...
Open the resolved locator · 10.1353/document.1435
Metadata licence: OpenAlex metadata (CC0)